NEC_PRACTICE NEC 2026

NEC 2026 Code Questions Practice Test 10

Free NEC 2026 practice test with 30 questions on modern power sources: solar PV circuit sizing and rapid shutdown, the 120% busbar rule, energy storage systems, EV charging equipment, generators, transfer switches, and emergency, legally required and optional standby systems.

Share this test
Want the real exam format? Take a free full-length exam for your state
TOPICS COVERED
NEC Practice Tests

How this test works

Read each question carefully
Look for absolute words like always / never — they often distinguish the right answer.
Manage your time
You have 45 min for 30 questions. Skip tough ones and come back.
Progress is auto-saved
Your answers are saved locally — a page refresh won't lose your work.
Review your answers
After submitting you'll see every explanation and your NEC references.

Before You Start

  • 30 questions, multiple choice
  • 45 minutes, pass mark 70%
  • Main articles: 445, 625, 690, 700, 701, 702, 705 and 706

Tip: Two numbers come up constantly: PV circuit current is Isc × 125%, and the 120% rule for backfeeding a panel busbar.

30
Questions
45 min
Time
70%
Pass

Timer starts immediately. Progress is auto-saved.

NEC_PRACTICE · NEC 2026
NEC 2026 Code Questions Practice Test 10
Q1 / 30
--:-- ON PACE
Auto-save 0% complete
0%
your score

0
Correct
0
Wrong
0
Skipped
0s
Time
How was this test?
Rate it and add a quick comment. No sign-up.
Tap one to send it now:
Share your score
Share it and get the NEC 2026 Article Quick Reference free, right now.
Unlocked — thanks for sharing! 🎉
Get the NEC 2026 Article Quick Reference
My Missed Questions

Electrician Reviews

No reviews yet — be the first to share your experience!

Leave a Review

5 stars
0/1000

NEC 2026 Code Questions Practice Test 10 — Question List

Question 1: Per NEC 690.7, the maximum PV system DC circuit voltage on or in one- and two-family dwellings is:

  • 1500 volts
  • 600 volts
  • 1000 volts
  • 300 volts

NEC Reference: NEC 2026 — 690.7

Question 2: Per NEC 690.8(A)(1), the maximum current of a PV source circuit (when not calculated by an engineer) is the sum of the parallel module short-circuit currents multiplied by:

  • 100%
  • 80%
  • 156%
  • 125%

NEC Reference: NEC 2026 — 690.8(A)(1)

Question 3: Per NEC 690.8(B), PV circuit conductors and overcurrent devices are sized at 125% of the maximum current. If maximum current is already Isc × 125%, the combined factor applied to Isc is about:

  • 125%
  • 156%
  • 200%
  • 150%

NEC Reference: NEC 2026 — 690.8(B)

Question 4: A PV source circuit has a module short-circuit current of 10 A. Using 690.8 (125% × 125%), what minimum conductor ampacity is needed before temperature correction?

  • 10 amperes
  • 20 amperes
  • 12.5 amperes
  • 15.6 amperes

NEC Reference: NEC 2026 — 690.8(A)(1) and 690.8(B)

Question 5: Per NEC 690.12, PV system rapid shutdown controls conductors on or in buildings. Outside the array boundary, controlled conductors must be limited to not more than 30 volts within how many seconds of rapid shutdown initiation?

  • 10 seconds
  • 30 seconds
  • 5 seconds
  • 60 seconds

NEC Reference: NEC 2026 — 690.12

Question 6: Per NEC 690.12(B), the "array boundary" used for rapid shutdown is defined as:

  • The edge of the roof
  • 3 feet from the array
  • 1 foot from the array in all directions
  • 10 feet from the array

NEC Reference: NEC 2026 — 690.12(B)

Question 7: Per NEC 690.13(A), the PV system disconnecting means must be installed at:

  • A readily accessible location
  • Inside the inverter only
  • Only on the roof next to the array
  • Any location chosen by the owner

NEC Reference: NEC 2026 — 690.13(A)

Question 8: Per NEC 705.12(B)(3)(2), the "120% rule" allows the sum of 125% of the inverter output current and the rating of the main overcurrent device to be up to 120% of the busbar ampacity, provided:

  • The PV backfeed breaker is at the opposite (load) end of the busbar from the main supply
  • The inverter is installed outdoors within sight of the panelboard
  • The PV breaker is installed right next to the main breaker at the top of the bus
  • The panelboard is rated at least 400 amperes and has a main breaker

NEC Reference: NEC 2026 — 705.12(B)(3)(2)

Question 9: A panel has a 200-ampere busbar and a 200-ampere main breaker. Using the 120% rule, what is the largest PV backfeed breaker permitted?

  • 50 amperes
  • 20 amperes
  • 60 amperes
  • 40 amperes

NEC Reference: NEC 2026 — 705.12(B)(3)(2)

Question 10: A panel has a 200-ampere busbar and a 200-ampere main breaker, so the 120% rule allows a 40-ampere maximum backfeed breaker. What is the largest continuous inverter output current permitted (breaker = 125% of inverter current)?

  • 48 amperes
  • 32 amperes
  • 40 amperes
  • 25 amperes

NEC Reference: NEC 2026 — 705.12(B)(3)(2)

Question 11: Per NEC 705.11, a "supply-side" connection of a power production source is made:

  • On the utility side of the meter only
  • At a branch-circuit receptacle
  • Between the service meter and the service disconnecting means
  • On the load side of the main breaker

NEC Reference: NEC 2026 — 705.11

Question 12: Per NEC 706.15, an energy storage system (ESS) must have a disconnecting means that:

  • Opens all ungrounded conductors derived from the ESS and is readily accessible
  • Opens only the DC conductors and is located inside the ESS enclosure
  • Opens only the grounded conductor and may be located anywhere
  • Is not required, because listed ESS equipment has internal protection

NEC Reference: NEC 2026 — 706.15

Question 13: Per NEC 625.40, each outlet installed for the purpose of charging electric vehicles must be supplied by:

  • The laundry circuit
  • An individual branch circuit with no other outlets
  • A shared garage receptacle circuit
  • Any 15-ampere circuit

NEC Reference: NEC 2026 — 625.40

Question 14: Per NEC 625.41, the overcurrent protection for EV supply equipment must be sized at not less than:

  • 100% of the EVSE rating
  • 150% of the EVSE rating
  • 80% of the EVSE rating
  • 125% of the maximum load of the EVSE

NEC Reference: NEC 2026 — 625.41

Question 15: A Level 2 EV charger is rated 48 amperes continuous. Per NEC 625.41, what is the minimum breaker size?

  • 60 amperes
  • 48 amperes
  • 50 amperes
  • 70 amperes

NEC Reference: NEC 2026 — 625.41

Question 16: Per NEC 625.54, receptacles installed for the connection of electric vehicle charging must have:

  • AFCI protection only
  • No special protection
  • GFCI protection for personnel
  • A weatherproof cover only

NEC Reference: NEC 2026 — 625.54

Question 17: Per NEC 625.43, EV supply equipment rated more than 60 amperes or more than 150 volts to ground must have a disconnecting means that is:

  • Installed in a readily accessible location and lockable in the open position
  • A cord and plug that can be removed by the vehicle owner
  • Optional, if the EVSE has an internal ON/OFF button
  • Located only at the service equipment, not near the EVSE

NEC Reference: NEC 2026 — 625.43

Question 18: Per NEC 445.13(A), the ampacity of the conductors from a generator's output terminals to the first overcurrent device must be at least:

  • 115% of the generator nameplate current rating
  • 125% of the nameplate current
  • 150% of the nameplate current
  • 100% of the nameplate current

NEC Reference: NEC 2026 — 445.13(A)

Question 19: Per NEC 445.18(D), a generator at a one- or two-family dwelling (other than a cord-and-plug-connected portable unit) must have an emergency shutdown device located:

  • On the generator only
  • At the utility meter only
  • Outside the dwelling at a readily accessible location
  • Inside the garage

NEC Reference: NEC 2026 — 445.18(D)

Question 20: Per NEC 445.20, 125-volt, 15- and 20-ampere receptacles on portable generators must have:

  • AFCI protection
  • No protection when used outdoors
  • Listed GFCI protection, integral to the generator or receptacle
  • A surge protector

NEC Reference: NEC 2026 — 445.20

Question 21: Per NEC 702.5, transfer equipment for optional standby systems must be:

  • A simple double-throw switch with no listing, if it is rated for the load
  • Installed only outdoors, next to the generator
  • Rated for half of the building load, since not all loads run at once
  • Suitable for the intended use and designed to prevent inadvertent interconnection of normal and alternate sources

NEC Reference: NEC 2026 — 702.5

Question 22: Per NEC 702.7(A), a sign at the service entrance must indicate:

  • The type and location of each on-site optional standby power source
  • The generator fuel type and tank size only
  • The date of installation and the next service date
  • The name and license number of the installing contractor

NEC Reference: NEC 2026 — 702.7(A)

Question 23: Per NEC 702.4(A)(2), with automatic transfer equipment for an optional standby system, the standby source must have adequate capacity to supply:

  • Only the lighting load, since other loads can be shed manually
  • Whatever loads the owner chooses, with no capacity requirement
  • 50% of the connected load, because of diversity between loads
  • The full load that will be transferred, unless an automatic load management system is used

NEC Reference: NEC 2026 — 702.4(A)(2)

Question 24: Per NEC 700.12, the emergency power source must be able to supply the emergency loads within how many seconds after failure of normal power?

  • 60 seconds
  • 5 seconds
  • 10 seconds
  • 30 seconds

NEC Reference: NEC 2026 — 700.12

Question 25: Per NEC 701.12, legally required standby systems must be able to supply power within how many seconds after failure of normal power?

  • 10 seconds
  • 30 seconds
  • 120 seconds
  • 60 seconds

NEC Reference: NEC 2026 — 701.12

Question 26: Per NEC 700.10(B), emergency circuit wiring must be:

  • Run in the same raceway as normal circuits
  • Installed in PVC only
  • Combined with standby wiring
  • Kept entirely independent of all other wiring and equipment, except as permitted

NEC Reference: NEC 2026 — 700.10(B)

Question 27: Per NEC 700.32, emergency system overcurrent devices must be:

  • GFCI type
  • Selectively coordinated with all supply-side overcurrent protective devices
  • Installed in the same panel as normal loads
  • Rated at least 400 amperes

NEC Reference: NEC 2026 — 700.32

Question 28: Per NEC 700.3(A), the emergency system must be tested:

  • Only at the factory by the manufacturer, before it is shipped
  • Witnessed by the AHJ at installation, then tested periodically on a schedule the AHJ approves
  • Only when the normal power actually fails, by the building owner
  • Once every 10 years, by the utility serving the building

NEC Reference: NEC 2026 — 700.3(A)

Question 29: Per NEC 690.56(C), buildings with PV systems that have rapid shutdown must have a permanent label:

  • Inside the main panel only, on the back of the door
  • At each service equipment location, showing where the rapid shutdown switch is
  • On the roof only, at the edge of the array
  • On the inverter only, next to its nameplate

NEC Reference: NEC 2026 — 690.56(C)

Question 30: Per NEC 690.4(C), the installation of PV system equipment and all associated wiring and interconnections must be performed by:

  • The utility company only
  • The homeowner
  • The module manufacturer only
  • Qualified persons

NEC Reference: NEC 2026 — 690.4(C)

EXAM CARD NEC_PRACTICE
Questions30
Time limit45 min
Pass score70%
Code editionNEC 2026
DifficultyIntermediate
Last reviewedJun 2026

Timer starts immediately. Progress is auto-saved.

Source: NEC 2026 (NFPA 70)