JOURNEYMAN NEC 2026

NEC 2026 Journeyman Practice Test 9

Free Online Journeyman Electrician Practice Test — NEC 2026 Edition 9This free 25-question practice test covers alternate power sources: portable and standby generators, transfer equipment, solar PV circuits and rapid shutdown, the 120% busbar rule, battery energy storage, and EV charging branch circuits.

Share this test
Want the real exam format? Take a free full-length exam for your state
TOPICS COVERED
journeyman electrician

How this test works

Read each question carefully
Look for absolute words like always / never — they often distinguish the right answer.
Manage your time
You have 38 min for 25 questions. Skip tough ones and come back.
Progress is auto-saved
Your answers are saved locally — a page refresh won't lose your work.
Review your answers
After submitting you'll see every explanation and your NEC references.

Frequently Asked Questions

Yes — completely free with no account required. All questions include detailed explanations and NEC references.

Most state Journeyman exams have 80–100 questions covering NEC code, wiring methods, branch circuits, motor controls, and load calculations.

Most states require a 70–75% passing score. This practice test uses the same 70% pass threshold so you know where you stand.

Questions are written to the 2026 NEC. Check your state licensing board to confirm which edition your state has adopted.

Before You Start

  • 25 questions, multiple choice
  • 37½ minutes, pass mark 70%
  • Main articles: 445, 625, 690, 702, 705 and 706
25
Questions
38 min
Time
70%
Pass

Timer starts immediately. Progress is auto-saved.

JOURNEYMAN · NEC 2026
NEC 2026 Journeyman Practice Test 9
Q1 / 25
--:-- ON PACE
Auto-save 0% complete
0%
your score

0
Correct
0
Wrong
0
Skipped
0s
Time
How was this test?
Rate it and add a quick comment. No sign-up.
Tap one to send it now:
Share your score
Share it and get the Journeyman Electrician Cheat Sheet — NEC 2026 free, right now.
Unlocked — thanks for sharing! 🎉
Get the Journeyman Electrician Cheat Sheet — NEC 2026
My Missed Questions

Electrician Reviews

No reviews yet — be the first to share your experience!

Leave a Review

5 stars
0/1000

NEC 2026 Journeyman Practice Test 9 — Question List

Question 1: A homeowner wants to connect a portable generator to the house panel. Per NEC 702.5, what is required?

  • Listed transfer equipment (transfer switch or listed interlock) that prevents interconnection with the utility
  • Nothing, portable generators are exempt
  • A "suicide cord" plugged into a dryer receptacle
  • Turning off the main breaker by hand with no interlock

NEC Reference: NEC 2026 — 702.5

Question 2: Per NEC 702.7(A), at the service entrance of a house with an optional standby generator, you must install:

  • A second meter for the generator output
  • A ground rod driven next to the generator
  • A sign showing the type and location of the standby power source
  • A red pilot light on the service panel

NEC Reference: NEC 2026 — 702.7(A)

Question 3: Per NEC 445.13(A), a 20 kW, 240-volt single-phase generator has a nameplate current of about 83 A. What minimum ampacity is required for the output conductors to the first overcurrent device?

  • 125 amperes
  • 104 amperes
  • About 96 amperes
  • 83 amperes

NEC Reference: NEC 2026 — 445.13(A)

Question 4: Per NEC 445.18(A), generators must have one or more disconnecting means that:

  • Are located only inside the house
  • Disconnect only the neutral
  • Disconnect all ungrounded conductors and are lockable in the open position
  • Are not required if the generator has a breaker

NEC Reference: NEC 2026 — 445.18(A)

Question 5: Per NEC 250.35, for a permanently installed generator, which requirement applies to the bonding of the generator?

  • No bonding is needed, because generators have their own frame ground
  • The neutral must be bonded in every subpanel fed by the generator
  • Only a ground rod at the generator is required
  • An equipment bonding jumper or supply-side bonding jumper is installed, depending on whether it is a separately derived system

NEC Reference: NEC 2026 — 250.35

Question 6: A transfer switch that does NOT switch the neutral conductor makes the generator:

  • A separately derived system with a neutral-to-ground bond at the generator
  • A non-separately derived system, so the generator's neutral must not be bonded to its frame
  • An emergency system
  • A legally required standby system

NEC Reference: NEC 2026 — 250.30 and 250.35

Question 7: Per NEC 690.8(A)(1), a PV string has modules with Isc of 11.5 A, with one string per circuit. What is the maximum circuit current?

  • 18 amperes
  • 12.5 amperes
  • 11.5 amperes
  • 14.4 amperes

NEC Reference: NEC 2026 — 690.8(A)(1)

Question 8: Per NEC 690.7(A), the maximum PV system voltage is calculated using the sum of module open-circuit voltages corrected for:

  • The highest summer temperature
  • The roof pitch
  • The lowest expected ambient temperature
  • The inverter efficiency

NEC Reference: NEC 2026 — 690.7(A)

Question 9: Per NEC 690.12, the purpose of rapid shutdown on PV systems on buildings is to:

  • Increase PV output by shutting down shaded modules
  • Protect the inverter from lightning surges on the roof
  • Allow the utility to shut down the system remotely
  • Reduce shock hazards for firefighters by lowering the voltage of PV conductors

NEC Reference: NEC 2026 — 690.12

Question 10: Per NEC 690.13, the PV system disconnecting means must be marked:

  • "SOLAR EMERGENCY ONLY"
  • "PV SYSTEM DISCONNECT" or equivalent
  • "MAIN BREAKER"
  • "DO NOT OPERATE"

NEC Reference: NEC 2026 — 690.13

Question 11: A dwelling has a 225-ampere busbar with a 200-ampere main breaker. Using the 120% rule in 705.12, what is the largest PV backfeed breaker allowed at the opposite end of the busbar?

  • 70 amperes
  • 40 amperes
  • 25 amperes
  • 45 amperes

NEC Reference: NEC 2026 — 705.12(B)(3)(2)

Question 12: Per NEC 705.12, when a PV breaker is backfed into a panelboard under the 120% rule, the panelboard must be marked:

  • With a warning that the power source output breaker must not be relocated
  • With the inverter serial number and installation date
  • "PV SYSTEM DISCONNECT" next to the backfed breaker
  • "SERVICE EQUIPMENT ONLY" on the panelboard cover

NEC Reference: NEC 2026 — 705.12

Question 13: Per NEC 690.41, PV systems may be grounded or ungrounded. A "functionally grounded" PV system is one that:

  • Uses a separate ground rod at every module in the array
  • Has no connection to ground anywhere in the system
  • Has an electrical reference to ground that is not solidly grounded, such as through a ground-fault protection device or inverter
  • Uses the neutral of the service as one of the PV conductors

NEC Reference: NEC 2026 — 690.41

Question 14: Per NEC 690.43, exposed non-current-carrying metal parts of PV module frames and mounting structures must be:

  • Bonded to the neutral
  • Connected to an equipment grounding conductor
  • Isolated from the building
  • Painted

NEC Reference: NEC 2026 — 690.43

Question 15: Per NEC Article 706, an energy storage system (ESS) installed in a building must be:

  • Rated over 600 volts
  • Installed only outdoors
  • Approved by the utility only
  • Listed

NEC Reference: NEC 2026 — Article 706

Question 16: Per NEC 705.10, where a building has a utility service plus other power sources such as PV or a battery system, a permanent plaque or directory must be installed at each service equipment location that:

  • Shows the location of all power source disconnecting means on or in the premises
  • Gives the date of the last inspection
  • Shows the PV module brand
  • Lists the installer's phone number

NEC Reference: NEC 2026 — 705.10

Question 17: A Level 2 EV charger is rated 32 amperes continuous at 240 volts. Per NEC 625.41, what is the minimum branch-circuit breaker size?

  • 50 amperes
  • 32 amperes
  • 35 amperes
  • 40 amperes

NEC Reference: NEC 2026 — 625.41

Question 18: A 40-ampere EV charging branch circuit uses THWN copper conductors with 75°C terminations. What is the smallest conductor size?

  • 12 AWG
  • 6 AWG
  • 10 AWG
  • 8 AWG

NEC Reference: NEC 2026 — Table 310.16 and 625.41

Question 19: Per NEC 625.40, may an EV charging receptacle share its branch circuit with the garage door opener?

  • Yes, but only in one-family dwellings
  • No, each EV outlet needs an individual branch circuit with no other outlets
  • Yes, if both the charger and the opener are GFCI protected
  • Yes, if the circuit is rated at least 30 amperes

NEC Reference: NEC 2026 — 625.40

Question 20: Per NEC 625.54, a 240-volt, 50-ampere receptacle installed in a garage for a plug-in EV charger must have:

  • AFCI protection only
  • GFCI protection
  • No GFCI because it is 240 volts
  • A while-in-use cover only

NEC Reference: NEC 2026 — 625.54

Question 21: Per NEC 625.17, the overall usable length of the output cable on EV supply equipment generally must not exceed:

  • 25 feet, unless a cable management system is used
  • 6 feet, the same as an appliance cord
  • 15 feet, measured from the EVSE to the vehicle connector
  • 50 feet, so the vehicle can be parked anywhere in a driveway

NEC Reference: NEC 2026 — 625.17

Question 22: Per NEC 220.57 (NEC 2023) and its NEC 2026 equivalent in Article 120, the load for EVSE in a load calculation is calculated at:

  • 1500 VA
  • The breaker rating times 240 volts
  • 5000 VA
  • 7200 watts (VA) or the nameplate rating, whichever is larger

NEC Reference: NEC 2026 — 220.57

Question 23: Per NEC 702.4(A)(1), for a manual transfer switch on an optional standby system, the generator must have adequate capacity for:

  • 125% of the service rating
  • The loads the user expects to operate at one time
  • Only the refrigerator
  • The entire calculated load of the building

NEC Reference: NEC 2026 — 702.4(A)(1)

Question 24: Per NEC 445.11, every generator must have a nameplate that includes the manufacturer's name, rated frequency, power factor, number of phases, kW or kVA rating, volts and amperes, and:

  • The name of the installer and the installation date
  • The address of the building it supplies
  • The fuel tank capacity and fuel type
  • Whether the neutral is bonded to the frame (for portable and stationary generators)

NEC Reference: NEC 2026 — 445.11

Question 25: Per NEC 705.20, the disconnecting means for a power production source (such as a PV inverter output) must:

  • Be inside the inverter enclosure only
  • Be located on the roof
  • Simultaneously disconnect all ungrounded conductors and be readily accessible
  • Disconnect only one conductor

NEC Reference: NEC 2026 — 705.20

Key NEC References for This Test

ArticleWhat It Covers
Art. 100Definitions — know: feeder, branch circuit, OCPD, dwelling unit
Art. 210Branch Circuits — GFCI/AFCI locations, circuit ratings, outlet spacing (most tested)
Art. 220Load Calculations — dwelling unit standard method
Art. 250Grounding & Bonding — GEC sizing, electrode system, EGC
Art. 310Conductors — ampacity (Table 310.12), insulation, derate rules
Art. 430Motors — conductor 125% FLA, OCPD 250% FLA, overloads, disconnects
Study Tip: Tab Articles 210, 250, and 430 in your NEC before the exam. Know the Table 310.12 ampacity values for 14, 12, 10, 8, 6, and 4 AWG copper.
EXAM CARD JOURNEYMAN
Questions25
Time limit38 min
Pass score70%
Code editionNEC 2026
DifficultyIntermediate
Last reviewedJun 2026

Timer starts immediately. Progress is auto-saved.

Source: NEC 2026 (NFPA 70)