MASTER NEC 2023

Master Electrician Practice Test 21 – Advanced Load Calculations

This is Master Electrician Practice Test 21 — Advanced Load Calculations, going beyond basic dwelling calculations into the commercial, multifamily, and existing-building math that separates a master from a journeyman. The test has 25 multiple-choice questions on demand factors for receptacles and kitchen equipment, neutral load sizing, evaluating existing loads with real demand data, show windows and signs, and combining continuous with noncontinuous loads. Pass score is 70%. Every question includes a full NEC 2023 explanation so you can trace each answer back to the exact code section.

Share this test
Want the real exam format? Take a free full-length exam for your state
TOPICS COVERED
Advanced Load Calculations master electrician

How this test works

Read each question carefully
Look for absolute words like always / never — they often distinguish the right answer.
Manage your time
You have 45 min for 25 questions. Skip tough ones and come back.
Progress is auto-saved
Your answers are saved locally — a page refresh won't lose your work.
Review your answers
After submitting you'll see every explanation and your NEC references.

Frequently Asked Questions

Yes — completely free with no signup required. All answers include detailed explanations.

Requirements vary by state but typically include 4–8 years of documented electrical work experience plus a valid Journeyman license.

Advanced NEC code interpretation, load calculations, service entrance design, motor controls, generator systems, and electrical system design.

The Master exam focuses more on design, calculations, and planning rather than installation details. Load calculation and service sizing questions are weighted heavily.

Before You Start

  • 25 questions — multiple choice
  • 45 minutes to finish (timer starts when you begin)
  • Pass score is 70% — you need at least 18 correct answers
  • Full NEC 2023 explanation shown for every question after you submit
  • Keep a pencil and paper handy — several questions need real math, not just a code lookup

Topics in This Test

  • Dwelling general lighting demand factor — first 3000VA at 100% (NEC Table 220.45)
  • Optional dwelling calculation — 100% of first 10kVA plus 40% of the rest (NEC 220.82)
  • Optional multifamily calculation — Table 220.84 demand factor for 20 units
  • Non-dwelling receptacle load demand — first 10kVA at 100%, rest at 50% (NEC Table 220.47)
  • Feeder/service neutral demand factor — 70% of unbalanced load over 200A (NEC 220.61)
  • Neutral demand factor restriction for nonlinear 3-phase loads (NEC 220.61)
  • Evaluating existing loads with real demand data (NEC 220.87)
  • 220.87 calculation — 125% of maximum demand plus new load
  • 220.87 restriction where solar, wind, or peak shaving is present
  • Show window unit load — 200 VA per linear foot (NEC 220.43)
  • Fixed appliance demand factor — 75% for four or more appliances (NEC 220.53)
  • Motor load addition to other calculated loads (NEC 220.50)
  • Combining continuous and noncontinuous loads for conductor sizing
  • Commercial kitchen equipment demand factor concept (NEC Table 220.56)
  • Household range demand — Column C of NEC Table 220.55
  • Multi-occupancy building — summing individual unit loads
  • Two-family dwelling — applying the optional method per unit
  • 2020 rewrite of non-dwelling unit loads — which values went up (NEC Table 220.42(A))
  • Non-dwelling general lighting load with the 125% continuous factor (NEC Table 220.42(A))
  • General-purpose receptacle unit load — 180VA per outlet (NEC 220.14)
  • Condition for using the optional multifamily method (NEC 220.84)
  • Why general lighting load is based on floor area, not actual fixture wattage
  • Sign/outline lighting circuit calculated load — minimum 1200VA (NEC 220.14)
  • Neutral demand calculation above 200 A (NEC 220.61(B))
  • Worked example — combined continuous and noncontinuous feeder load

Tip: Demand factors almost always follow the same shape: 100% of a smaller first chunk, then a lower percentage on everything past that. Learn the break point and the percentage for each table instead of memorizing isolated numbers — the logic transfers across tables.

25
Questions
45 min
Time
70%
Pass

Timer starts immediately. Progress is auto-saved.

MASTER · NEC 2023
Master Electrician Practice Test 21 – Advanced Load Calculations
Q1 / 25
--:-- ON PACE
Auto-save 0% complete
0%
your score

0
Correct
0
Wrong
0
Skipped
0s
Time
How was this test?
One tap, no sign-up.
Share your score
Share it and get the Master Electrician Cheat Sheet — NEC 2026 free, right now.
Unlocked — thanks for sharing! 🎉
Get the Master Electrician Cheat Sheet — NEC 2026
My Missed Questions

Electrician Reviews

No reviews yet — be the first to share your experience!

Leave a Review

5 stars
0/1000

Master Electrician Practice Test 21 – Advanced Load Calculations — Question List

Question 1: Under NEC Table 220.45, what percentage demand factor applies to the first 3000VA of a dwelling unit's general lighting load?

  • 100%
  • 75%
  • 50%
  • 35%

NEC Reference: NEC Table 220.45

Question 2: Under the optional dwelling calculation in NEC 220.82, how are the general loads (everything besides heating/AC) demand-factored?

  • 100% of the first 10kVA, plus 40% of the remainder
  • 50% of everything, flat, no tiers
  • 100% of everything with no reduction
  • 25% of the first 10kVA, plus 100% of the remainder

NEC Reference: NEC 220.82

Question 3: An apartment building has 20 dwelling units, each with electric cooking and electric space heating, meeting all the conditions of NEC 220.84. What demand factor applies under Table 220.84?

  • 35%
  • 38%
  • 40%
  • 43%

NEC Reference: NEC 220.84, Table 220.84

Question 4: An office building has a total calculated receptacle load of 18,000 VA. Applying NEC Table 220.47, what is the demand load after the demand factor?

  • 9,000 VA
  • 14,000 VA
  • 18,000 VA
  • 4,000 VA

NEC Reference: NEC Table 220.47

Question 5: The 70% neutral demand factor in NEC 220.61 cannot be used to reduce the neutral for which type of load?

  • Nonlinear loads on a 3-phase, 4-wire wye system
  • Any single-phase dwelling load
  • Only motor loads
  • Only lighting loads

NEC Reference: NEC 220.61

Question 6: Before you can use actual maximum demand data to size an addition under NEC 220.87, what must you have on hand?

  • At least 1 year of actual demand data, or a 30-day reading covering the peak season
  • A single instantaneous reading taken any day of the year
  • No data is needed — this method is always assumed
  • A verbal estimate from the building owner

NEC Reference: NEC 220.87

Question 7: A building's existing service has a documented maximum demand of 300A. Under NEC 220.87, what value must be added to the new load being installed to check against the service rating?

  • 300A
  • 345A
  • 375A
  • 450A

NEC Reference: NEC 220.87

Question 8: The NEC 220.87 method for evaluating existing loads cannot be used if the feeder or service already has which of the following?

  • A solar PV system, wind system, or peak load shaving
  • A dishwasher
  • A single light fixture
  • A doorbell transformer

NEC Reference: NEC 220.87

Question 9: A retail store has a 40 ft show window. What minimum load must be included in the service calculation for that show window under NEC 220.43?

  • 2,000 VA
  • 4,000 VA
  • 8,000 VA
  • 16,000 VA

NEC Reference: NEC 220.43

Question 10: A dwelling has five fastened-in-place appliances (not counting ranges, dryers, and space heating/AC), each rated 1,000VA. What total demand load does NEC 220.53 allow for these appliances?

  • 5,000VA
  • 3,750VA
  • 2,500VA
  • 4,500VA

NEC Reference: NEC 220.53

Question 11: A feeder supplies three motors with full-load currents of 20A, 15A, and 10A. Per NEC 220.50 (which points to Article 430), what current value is added to the other calculated loads on that feeder?

  • 45A
  • 50A
  • 56.25A
  • 45.625A

NEC Reference: NEC 220.50

Question 12: When a feeder supplies both a continuous load and a noncontinuous load, how are conductors and the overcurrent device sized for the combined total?

  • 125% of the continuous portion plus 100% of the noncontinuous portion
  • 100% of both portions, added together
  • 125% of both portions, added together
  • 100% of the continuous portion plus 125% of the noncontinuous portion

NEC Reference: NEC 215.2 / 210.19

Question 13: When a commercial kitchen has several pieces of electric cooking equipment on one feeder, what does NEC Table 220.56 generally do to the demand load as more pieces of equipment are added?

  • It lowers the demand factor as more equipment is added
  • It raises the demand factor as more equipment is added
  • It has no effect on the demand factor
  • It removes the need for any load calculation entirely

NEC Reference: NEC Table 220.56

Question 14: Four household electric ranges, each rated 12 kW, are supplied by one feeder. Using Column C of NEC Table 220.55, what is the demand load?

  • 14 kW
  • 17 kW
  • 20 kW
  • 48 kW

NEC Reference: NEC Table 220.55

Question 15: A building contains four separate retail tenant spaces, each fed by its own metering but sharing one service. How is the total service load generally determined?

  • Calculate each tenant space individually, then sum the results
  • Use only the largest tenant's load for the entire building
  • Average the four tenant loads together
  • Ignore three of the four tenant spaces

NEC Reference: NEC Article 220

Question 16: Can the optional calculation method for dwelling units (NEC 220.82) be applied separately to each unit of a two-family dwelling?

  • Yes, for each unit whose entire load is served by its own feeder or service (100 A or more)
  • No, two-family dwellings must always use the standard method
  • Only if both units are exactly the same size
  • Only if neither unit has electric heat

NEC Reference: NEC 220.82

Question 17: Per NEC 220.54, what is the minimum load used for each household electric clothes dryer in a dwelling load calculation?

  • The nameplate rating only, even if it is smaller
  • 5,000 watts or the nameplate rating, whichever is larger
  • 1,500 watts
  • 3,000 watts

NEC Reference: NEC 220.54

Question 18: A dwelling has 10 kVA of electric heat and a 6 kVA air conditioner that will never run at the same time. Per NEC 220.60, what load is used in the calculation?

  • 8 kVA, the average of the two
  • 16 kVA, the sum of both
  • 6 kVA, the smaller of the two
  • 10 kVA, the larger of the two noncoincident loads

NEC Reference: NEC 220.60

Question 19: Per NEC 220.61(B)(1), the feeder neutral load for household electric ranges and dryers may be calculated at what percentage of the load on the ungrounded conductors?

  • 50%
  • 70%
  • 125%
  • 100%

NEC Reference: NEC 220.61(B)(1)

Question 20: When the general lighting load of a commercial (non-dwelling) occupancy is figured from the NEC unit-load table (Table 220.12 in NEC 2020), the note to that table says the 125% continuous-load multiplier:

  • Must always be added on top of the table values
  • Applies only to office buildings
  • Applies only when the lighting is LED
  • Is already included in the unit loads, so it is not applied again

NEC Reference: NEC Article 220 (non-dwelling lighting unit loads)

Question 21: Per NEC 220.14(I), each single or multiple receptacle on one yoke in a commercial building is calculated at not less than:

  • 200 VA
  • 1,500 VA
  • 180 VA
  • 120 VA

NEC Reference: NEC 220.14(I)

Question 22: Per NEC 220.14(F), each required sign or outline lighting branch circuit is calculated at a minimum of:

  • 180 VA
  • 600 VA
  • 1,200 VA
  • 1,500 VA

NEC Reference: NEC 220.14(F)

Question 23: An existing dwelling is adding load but not adding any heating or air conditioning. Under the optional method of NEC 220.83(A), the total load is calculated as:

  • 100% of the first 3 kVA plus 35% of the rest
  • 125% of the total load
  • 100% of the first 8 kVA plus 40% of the rest
  • 100% of the first 10 kVA plus 40% of the rest

NEC Reference: NEC 220.83(A)

Question 24: Using NEC Table 220.84, what demand factor applies to a multifamily building with 62 or more dwelling units?

  • 23%
  • 30%
  • 45%
  • 35%

NEC Reference: NEC Table 220.84

Question 25: A commercial kitchen has six cooking appliances on one feeder with a total connected load of 60 kW. Using NEC Table 220.56, what is the demand load (assuming it is not less than the two largest pieces)?

  • 60 kW
  • 30 kW
  • 42 kW
  • 39 kW

NEC Reference: NEC Table 220.56

Key NEC References for This Test

ArticleWhat It Covers
Art. 220Load Calculations — optional and standard methods for multifamily
Art. 230Services — service design, sizing, multiple disconnects
Art. 430Motors — complete branch circuit design (conductor + OCPD + overload + disconnect)
Art. 445Generators — standby systems, transfer switches
Art. 450Transformers — sizing, primary/secondary OCPD, installation
Art. 706Energy Storage Systems — battery/solar storage (major NEC 2026 expansion)
Study Tip: Practice transformer kVA calculations daily. Know the formula: I = kVA × 1000 ÷ (V × 1.732) for three-phase. This comes up on almost every master exam.
EXAM CARD MASTER
Questions25
Time limit45 min
Pass score70%
Code editionNEC 2023
DifficultyIntermediate
Last reviewedJun 2026

Timer starts immediately. Progress is auto-saved.

Source: NEC 2026 (NFPA 70)